Core Strategy - Consultation Draft
List Comments
3 comments.
Respondent | Response Date | Details |
---|---|---|
Highways England | 18 Feb 2010 | Core Strategy - Consultation Draft Chapter 6: Delivery Chapter 6: Introduction
Infrastructure delivery policies are key to the Agency. Flexibility needed throughout plan period so that contributions are sought for infrastructure as developments come forward. Major highways infrastructure requirements should be agreed early to allow contributions to be collected from day one.
|
CLIFF DUMBELL | 15 Feb 2010 | Core Strategy - Consultation Draft Chapter 6: Delivery Chapter 6: Introduction
Ensure that the language used in the final draft is sharper and without loopholes.
|
Backwell Parish Council | 12 Feb 2010 | Core Strategy - Consultation Draft Chapter 6: Delivery Chapter 6: Introduction
Chapter 6 - Delivery: Some sensible comments.
|